UPS and Generator Capacity Test Record

Use this record to verify whether UPS and generator capacity matches the documented availability and continuity requirements.

On this page

When to use this

Use this record to verify whether UPS and generator capacity matches the documented availability and continuity requirements.

Capacity test

System Facility/load supported Required runtime Tested runtime Load included Cooling included? Result Evidence location
TBD TBD TBD TBD Servers/network/HVAC/security systems Yes/No Pass/Fail TBD

Test checklist

  • Required runtime is documented.
  • Actual load is measured or reasonably calculated.
  • Cooling and environmental controls are included where required.
  • Generator fuel assumptions are verified.
  • Test result is reviewed by responsible owner.
  • Gaps are entered into corrective action tracking.