When to use this
Use this record to verify whether UPS and generator capacity matches the documented availability and continuity requirements.
Related controls
Capacity test
| System | Facility/load supported | Required runtime | Tested runtime | Load included | Cooling included? | Result | Evidence location |
|---|---|---|---|---|---|---|---|
| TBD | TBD | TBD | TBD | Servers/network/HVAC/security systems | Yes/No | Pass/Fail | TBD |
Test checklist
- Required runtime is documented.
- Actual load is measured or reasonably calculated.
- Cooling and environmental controls are included where required.
- Generator fuel assumptions are verified.
- Test result is reviewed by responsible owner.
- Gaps are entered into corrective action tracking.